M-13.1, r. 1 - Regulation respecting petroleum, natural gas and underground reservoirs

Full text
91. A holder of a lease to produce petroleum and natural gas shall measure the gravitational flow of natural gas of a new well by means of the back pressure method, by carrying out successively at least 4 flow tests, from the lowest to the highest.
O.C. 1539-88, s. 91.